Environmental Conditions Control

Oct 11, 2025 Leave a message

Precautions for Floor Treatment Agents

When using floor treatment agents, pay attention to substrate preparation, environmental conditions, material ratios, and construction details to ensure quality and safety.

 

Substrate Preparation Requirements

Cleanliness: Thoroughly remove dust, oil stains, old paint layers, cement laitance, and other contaminants before application. Use a grinder to treat loose layers or pits if necessary.

 

Moisture Content: Concrete substrate moisture must be below 8%. Newly poured concrete requires at least one month of curing.

 

Flatness: Surface deviation within a 2-meter radius must not exceed 2mm. Cracks or pits require repair with epoxy mortar.

 

Temperature: Application temperature must be ≥5°C, with an optimal range above 10°C. Avoid low temperatures causing slow curing or high temperatures triggering thermal cracking.

 

Humidity: Relative air humidity must be <85%. Substrate surface temperature must exceed the ambient dew point by at least 3°C to prevent film whitening or blistering. ‌

 

Material & Application Specifications

Mixing Ratio: Strictly blend base material and hardener per instructions. Two-component materials must be used within specified pot life to prevent curing-related quality issues. ‌

 

Application Method: Apply evenly using roller brush or spray. Apply a second coat after 1 hour. Never mix the hardener with other agents. ‌

 

Curing: Walkable after 24 hours; fully usable after 72 hours. Avoid heavy object碾压 or chemical contamination during curing. ‌

 

Common Issue Prevention

Blistering: Excessive substrate moisture content or lack of waterproofing layer may cause blistering. Test moisture content beforehand and enhance primer penetration.

 

Cracking: Improper expansion joint placement or untreated structural cracks may lead to regular cracking. Reserve expansion joints and fill cracks with elastic sealant.